Section 35AC of the Income-tax Act, 1961 - Eligible Projects or Schemes, Expenditure on - Notified Eligible Projects or Schemes
Notification No.3/2016 [F.No.V.27015/1/2016-SO(NAT.COM)] / SO 1103(E) was published on 15 March 2016. Its subject is Section 35AC of the Income-tax Act, 1961 - Eligible Projects or Schemes, Expenditure on - Notified Eligible Projects or Schemes.
This notifies a named person, body, fund or instrument for the purpose of a provision. Nothing in it changes the provision itself.
| Under the 1961 Act | Now |
|---|---|
| s.35AC | no counterpart recorded |
SECTION 35AC OF THE INCOME-TAX ACT, 1961 - ELIGIBLE PROJECTS OR SCHEMES, EXPENDITURE ON - NOTIFIED ELIGIBLE PROJECTS OR SCHEMES
NOTIFICATION NO. SO 1103(E) [NO.3/2016 (F.NO.V.27015/1/2016-SO (NAT.COM)], DATED 15-3-2016
In exercise of the powers conferred by sub-section (I) read with clause (b) of the Explanation to section 35AC of the Income Tax Act, 1961 (43 of 1961), the Central Government, on the recommendation of the National Committee for Promotion of Social and Economic Welfare, hereby notifies the institutions approved by the said National Committee, mentioned in column (2) of the Table below, and approves the eligible projects or schemes specified to be carried on by the said institutions and the estimated cost thereof as mentioned in column (3) of the said Table, and also specifies in the column (4) of the Table the maximum amount of such cost which may be allowed as deduction under the said section 35AC for the period of approval, namely:—
TABLESerial No.
Name of the Institution
Project or scheme and estimated cost thereof
Maximum amount of cost to be allowed as deduction under section 35AC and period of approval(1)
(2)
(3)
(4)1.
Alternative for Rural MovementAT: Parulia, PO : Asti;VIA: BaliapalDist. BalasoreOdisha-756026
Vocational Skill Development Training for Economic Empowerment of Women, Youth and Establishment of Health, Care Centre for the Economically Backward People in Balasore District. Rs 28.95 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 28.95 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.2.
Fazlani Aishabai & HajiAbdul Latif Charitable Trust,21st Floor, Nirmal, Nariman Point,Mumbai- 400021.
Maintenance of present activities and starting connected activities for economic growth of people of rural area. Rs. 32.55 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 32.55 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.3.
Harijan Sevak SanghGandhi Ashram, KingswayCamp, Delhi-110009.
Harijan Sevak Sangh – Ladies Hostel Construction Ground + 1st floor, S.No.378/2, Block No.24,Door No.77, Mc Nicholas Road, Chetpur, Chennai-600031, Tamil Nadu. Rs. 8.43 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 8.43 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.4.
AgragameeAT/PO Kashipur,Distt. Rayagada,Odisha-765015.
Comprehensive Development of Villages located in remote Tribal District of Odisha focusing on Education and livelihood security.Rs. 8.64 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 8.64 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.5.
D V S Kalyan Samiti (Divine Vision Samaj Kalyan Samiti)H.No.1/1480 B, Nawada Road,Gopal Tent House, NearSharda Nagar, Saharanpur,Uttar Pradesh.
Empower Rural Youth Through Skill Training .Rs.1030.00 lakh.
The Committee recommended approval for the project at the estimated cost of Rs. 1030.00 Lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.6.
Desh Bandhu & Manju Gupta FoundationWorld Trade Tower, 4thFloor, Barakhamba Lane,Connaught Place, New Delhi - 110001.
Change India Programme. Rs. 6004.00 lakh.
The Committee recommended approval for the project at the estimated cost of Rs. 6004.00 Lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.7.
Amma Nanna Anadha Ashraam,#3-330/1H/2,Choutupal Choutuppal,Nalgonda,Choutuppal,Telengana-508252.
Insane People Aashtramam (Home for Street Beggar) Rs. 463.72 lakh.
The Committee recommended approval for the project at the estimated cost of Rs. 463.72 Lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.8.
Chaitany Seva Sansthan, Near Gomti Das temple Gomti Colony, Karauli, Rajasthan.
Prevention of Alcoholism and Drugs abuse Rs. 50.00 lakh.
The Committee recommended approval for the project at the estimated cost of Rs. 50.00 Lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.9.
Know-how to Grassroot NewTechnology (KGNT)Village/Post-Kandetaea,Via-KommnaDisttrict-Nuapada-766106Odisha.
Proposal for construction of School Building, Vocational Training center for women & Hostel for Boys & Girls Rs.16.75 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 16.75 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.10.
Pooja Women's Development TrustMain Road, Kovilur DistrictTamil Nadu – 624706.
Resurge (Relief) to weaker Sector. Rs. 6.00 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 5.30 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.11.
The United Action for Rural Development, Manipur P.O. Nunga, Tamenlong, Manipur-795147.
Infrastructure (Rural Road)Development and Poverty Elevation.Rs.1842.75 lakh.
The Committee recommended approval for the project at the estimated cost of Rs. 1842.75 lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.12.
Vision Foundation of India ('VFI'/Trust')5, Babulnath Road,Mumbai-400007.
Rashtriya Netra Yagna. Rs 40.00 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 40.00 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.13.
Beypore Mandalam Development Mission Charitable Trust,11/582, MLA Office, Cheruvannur,Feroke, Kozhikode DistrictKerala-673631.
Dialysis Centre. Rs 5.17 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 4.38 Crore for three financial years commencing with financial year,2015-16 i.e., 2015-16, 2016-17 and 2017-18.14.
Gram Vikas Mandal, At: Paliad,Ta. Kalol,Distt. Gandhinagar, Gujarat-382735.
S.J. Patel Sarvajanik Hospital Rs. 55.00 lakh.
The Committee recommended approval for the project at the estimated cost of Rs.55.00 lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.15.
Biswabandhu MissionP.O. Srikhanda, DisttBurdwan,West Bengal-713150.
Rural underprivileged Children irrespective of Caste, creed and race Rs. 57.60 lakh.
The Committee recommended approval for the project at the estimated cost of Rs. 57.60 lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.16.
Care Promise Welfare Society,331, First Floor, Sant Nagar,East of KailashNew Delhi-110065.
Community Health Care Centres (Dispensaries) exclusively for women and children upto 12 years of age in rural areas of Uttar Pradesh Rs. 10.68 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 10.68 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.17.
Magic Bus India FoundationTodi Estate, No. 5 A Wing2nd Floor, Sun MillsCompound Lower Parel (w)Mumbai – 400 013.
Magic Bus skill development & livelihood Programme in all the states of India. Rs. 54.00 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 54.00 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.18.
Pavitra Eduction Trust,A-74, S/F Swashthiya Vihar,Near Bal Bhawan Public School,Delhi-110092.
Health Education and Literacy Awareness Programme for the Sustainable Development of the marginalized People at slum areas of New Delhi, Delhi State. Rs. 2 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 2.00 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016 - 1 7 and 2017-18.19.
Gramin Vikas Trust Veer Annex,1st Floor, behind Circuit House,Abu High Way, Palanpur,Distt: Banaskantha, Gujarat
Construction of Hospital. Rs. 9.39 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 9.39 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.20.
Don Bosco High School Society,Vazira Naka, Borivali West Mumbai,Maharashtra-400091.
Don Bosco Jr. College and Information Technology. Rs.1419.30 lakh.
The Committee recommended approval for the project at the estimated cost of Rs. 1219.30 lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.21.
Nirmaya Arogya Dham,52-C, Gold Finch Peth,Navi Peth, Solapur, Distt. Solapur,Maharashtra-413007.
(1) Mobile 1000(2) Child living with HIV/AIDS (CLHA) A project for 350 CLHA's.Rs.1.29 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 1.29 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.22.
Anjuman Dardmandane-Talim-O-Tarakki Trust,Anjuman Shopping Centre 1st floor,Near S.t. Stand Mahad, Ta – Mahad Distt.-Raigad,P.O. Box No.10, Maharashtra.
Construction of school building for computer & science & science laboratory of the Trust and providing medical & financial assistant to widow (above 65= years) & economic weaker section of society in Raigad District of Maharashtra. Rs. 4.10 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 4.10 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.23.
Ernst & Young Foundation,6th Floor, Hindustan Times Building,18-20, Kasturba Gandhi Marg,New Delhi-110001.
Student Scholarship Program. Rs. 7.84 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 7.84 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.24.
Janata Bahu Uddeshiya Sanstha,Near Sunnah Hospital Ganga Nagar,Wahim Road, Akola,Maharashtra-444002.
Expansion of present activities at residential school Rs.19.71 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 19.71 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.25.
NISWARTHA(National Institute of SocialWork and ReformativeThought on Human Affairs)AT/PO/DISTT. ; NayagarhOdisha-752069.
Ensuring Livelihood for Rural ST/SC/Minority/OBC youths through Vocational Skill development and placement centre for rural development in (Naxalite – Maoist insurgency affected & left Wing Extremism (LWE) covered Kandhamal District, Odisha. Rs. 8.91 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 8.91 Crore for three financial years commencing with financial year,2015-16 i.e., 2015-16, 2016-17 and 2017-18.26.
Gram Vikas Trust A-18,Pushapdhan Bungalows,Link Road, Near HDFC Bank,Bharuch-392001 (Gujrat).
Quality Education project for underprivileged children of rural community. Rs. 15.48 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 15.48 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.27.
Sinkhai Foundation Medley House,Dr, M.I.D.C. Area,Andheri (East), Mumbai-400093.
Educational & Medical Facilities for weaker section peoples. Rs. 13.36 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 13.36 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.28.
The Gujarat Sarvajanik Welfare Trust2nd Floor, Bagmar Plaza,Opp. APMC Market,Jamalpur Char Rasta,Ahmadabad -380 022.
Construction of ITI and one more School Building and Recurring Expenditure thereof for 3 years. Rs.13.05 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 13.05 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.29.
Ramakrishna VedantaAshramAsuti Main Raod, P.O.VivekanandapurVia Maheshtala,Kolkata – 700 141.
Preventive Health care with primary medical support to destitute women & children of Rural and urban slums Rs.10.62 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 10.62 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.30.
Ashwamegh Gramin Panlot KshetraVikas Va Shaikshanik SansthaFattepur (Shivangao)Tq.Teosa, District Amravati,Maharashtra.
Proposal for addressing agrarian crises for halting farmer's suicides through water conservation and livelihood enhancement activities. Rs.9.89 Crore.
The Committee recommended approval for the project at the estimated cost of Rs.9.89 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2 0 1 6 - 1 7 a n d 2017-18.31.
Shrimad Rajchandra AatmaTatva Research Centre 702,Sharda Chambers,New Marine Lines,Mumbai-400020.
Nurture a future. Rs.66.78 crore.
The Committee recommended approval for the project at the estimated cost of Rs.66.78 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.32.
Dharmagiri Social Welfare and Development Trust, No.9. O.B.Choodahalli, Udayapura Post Near Art of Living,Bangalore - 560082.
Eye Hospital in Rural Area Rs.5.00 Crore.
The Committee recommended approval for the project at the estimated cost of Rs.5.00 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.33.
Centre For Development andCommunication Trust (CENDECT)89-A/B-3, West StreetKamatchipuram(S.O.)Theni District-625520Tamil Nadu.
(i) Mentally Retarded school and hostel and Kamatchipuram and Varusanadu(ii) Computer Training centre for Disabled persons(iii) Community based rehabilitation(CBR)project through income generation activities for the disabled SHGs and the disabled persons(iv) Residential School and Hostel building for SC children Rs. 5.90 Crore.
The Committee recommended approval for the project at the estimated cost of Rs.5.90 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.34.
Neelvasant MedicalFoundation & Research Centre,'Gautam' New Pandit Colony,Opp.LionsGarden,Sharanpur Road,Maharashtra-422002.
Constructing Super Specialty Medical Hospital. Rs. 10.02 crore.
The Committee recommended approval for the project at the estimated cost of Rs.10.02 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.35.
SIMS Sansthan Sun Campus,Navkar University Road Udaipur,Rajasthan.
Gyan Asharay. Rs. 5.75 crore.
The Committee recommended approval for the project at the estimated cost of Rs.5.75 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.36.
Shri Rajasthan S.S. Jain Sangh,9/A, 10/B, Shri Hari NagarCo. Operative Housing Society,Dor Bazar, Kankariya,Ahmedabad-380022.
Nayan Mandir – To Provide free eye care paramount quality to all segments of society, especially socially backward and deprived section of the Society in rural areas of Ahmadabad District.Rs.269.21 lakh including corpus fund of Rs. 75.00 lakh.
The Committee recommended approval for the project at the estimated cost of Rs.269.21 lakh including a corpus fund of Rs.75.00 lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.37.
Seba Jagat At/PO/Via- M. RampurDistt- Kalahandi, Odisha-766102.
Establishment of Nursing School-College with Dispensary, Vocational Skill Development Institute for BPL and Economic Weaker people in the concept of Digital India for Kalahandi District people of Odisha State. Rs. 7.78 Crore.
The Committee recommended approval for the project at the estimated cost of Rs.7.78 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.38.
Shramik Naari Sangh, 702,Sharda Chambers, New Marine Lines, Mumbai-400020.
Vocational Training & Women Empowerment Centre. Rs. 15.41 Crore.
The Committee recommended approval for the project at the estimated cost of Rs.15.41 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.39.
Santosh Institute for MentallyChallenge Children TrustBuilding No.54/2497, M.H.B. ColonyGandhi Nagar, near MIGCricket ClubBandra (E), Mumbai-51.
Day Care & residential School with Vocational Training Centre for Disable and Mentally Challenged children of Mumbai and rural areas of Maharashtra. Rs. 6.19 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 6.19 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.40.
Shree Raj Saubhag Satsang Mandal22, Shantiniketan3rd floor, 95-A, Marine DriveMumbai-400002.
(i) Community Health Center(ii) Pujya L.M. Vora Girls High School(iii) Pujya L.M. Vora College of Arts &Commerce, Sayla(iv) Eye Hospital(v) Prem Ni Parab. Rs. 2565.25 lakh.
The Committee recommended approval for the project at the estimated cost of Rs. 2565.25 lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.41.
Mind Genius Charitable Trust 609,Main Frame-1, Royal Palms,Goregaon (E) Mumbai-400063.
Youth Empowerment Project (YEP).Rs. 6.20 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 6.20 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.42.
Janhit Vikas Samiti Professor Colony,Line Par, Mirzapur,Nawada-804110 Bihar.
Providing rain water harvesting-cum-spring water harnessing for irrigation for rural areas at Nawada in Bihar, free of cost. Rs.1600.00 lakh.
The Committee recommended approval for the project at the estimated cost of Rs.1600.00 lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.43.
Good Friend Society D-Block,Burma Camp Dimapur,Nagaland-797112.
Alternative Employment support to poor Tribal through Income Generation Programme. Rs.9.13 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 9.13 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.44.
Abhishek Vidyalayam Plot No. GP1 - 128,'G' Block, MIDC, Shahunagar,Chinchwad, Pune – 411019.
Rehabilitation of 500 economically weaker students through education and residence for Girls. Rs. 6.00 crore.
The Committee recommended approval for the project at the estimated cost of Rs.6.00 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.45.
Umang Charitable trust, 93/924,Siddhi vinayak Co-Op Mahavir Nagar,Kandivali (W), Mumbai – 400067.
School for the Autistics and Multiple Disorders Rs. 4.32 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 4.32 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.46.
Dr. Aabaji Thatte Seva AurAnusandhan SansthaPlot No. 293, "Sitaram Smruti",WHC Road,Nagpur-440010 Maharashtra.
Maharashtra.~National Cancer Institute. Rs. 250.00 crore.
The Committee recommended approval for the project at the estimated cost of Rs.250.00 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.47.
The Akansha Foundation 7,KrishnaMahal, Marine LinesMumbai-400020.
The School Project. Rs. 52.49 crore.
The Committee recommended approval for the project at the estimated cost of Rs.52.49 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.48.
Janhit Sewa Sansthan ShaktipurmColony District Rampur Uttar Pradesh – 244901.
(1) Special project for placement linked skill development of Rural Urban BPL Youth(2) Construction of school (CBSE pattern) Building run by Society for Weaker section. Rs. 7.40 Crore.
The Committee recommended approval for the project at the estimated cost of Rs.7.40 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.49.
Shri Chakradhar Kalyan SamitiPlot No.4, Behind HawaBaghMethodist Church, Narmada RoadJabalpur,-482004Madhya Pradesh.
Mercy Old Age Home. Rs. 3.79 crore.
The Committee recommended approval for the project at the estimated cost of Rs.3.79 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.50.
Vedanta Foundation,Opposite Niranjan Building,Corner of 'E' Road, Marine Drive,Mumbai – 400002.
Vedanta Nand Ghar Project. Rs. 612.00 crore.
The Committee recommended approval for the project at the estimated cost of Rs. 612.00 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.51.
Salam Educational & Others WelfareSociety Behind Balbhim College,Killa Maidan District Beed,Maharashtra-43122.
Setting of modern education school and hospital for BPL. Rs.5.49 Crore.
The Committee recommended approval for the project at the estimated cost of Rs.5.49 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.52.
Shroffs Foundation Trust At & Post :Kalali-390012 Taluka &District : Vadodara Gujarat.
Sustainable Natural Environment, Health and Agriculture (SNEHA). Rs.14.63 Core (including Rs.3.00 Crore toward building corpus of SFT).
The Committee recommended approval for the project at the estimated cost of Rs. 14.63 Crore including Rs.3.00 Crore towards building corpus of SFT for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.53.
Deepam Blind Development Trust,Plot No.203C, Door No.21,Nellaiyappar Street, Thirunagar 6th Stop,Madurai-625006 Tamilnadu.
Project Proposal seeking financial Assistance for establishing of nursing school-college, vocational Training Centre, 40 bedded hospital &full-fledged mobile medical Van for the development of targeted people of Madurai District, Tamilnadu. Rs. 14.62 Crore.
The Committee recommended approval for the project at the estimated cost of Rs.14.62 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.54.
The Kalgidhar Society,VPO- Baru Sahib Via RajgarhDistrict SirmourHimachal Pradesh-173101.
Upgrading of the existing 209 Bed Charitable Hospital for free medical care for Tribal/Rural Poor's of Himachal Pradesh. Rs. 6.00 crore.
The Committee recommended approval for the project at the estimated cost of Rs.6.00 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.55.
AHEADRehabilitation and Research Institute for Austistic andMentally Challenged Children Shree Baijnath Jalan Bhawan P-30,Prince Golam Mohammed Shah RoadKokatta-700095.
Relief and Rehabilitation of the handicapped children. Rs. 63.35 crore
The Committee recommended approval for the project at the estimated cost of Rs.63.35 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.56.
B.H.U. Alumni Mumbai Welfare Trust 408,Sai Chambers Near Railway Station, SantaCruz, Mumbai-400055.
To upgrade the facilities to establish children ICU & Trauma Centre at Pt. Madan Mohan Malaviya Shatabdi Hospital, Govandi, Mumbai. Rs.70.00 Lakh.
The Committee recommended approval for the project at the estimated cost of Rs.70.00 lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.57.
The Great Maulana Abul Kalam Azad MinorityEducational Trust, Gat No.36/1, TAL. South Solapur,Kumbhari-Hotgi Road, Solapur-413215,Maharashtra.
Proposal for Construction of College Building. Rs.13.50 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 13.50 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.58.
Motherchak Naboday Kishalay Sangha,Village Motherchak, P.O. BargokulpurP.S.-Kharagpur (Local),District- Paschim MedinipurWest Bengal-721301.
Multi Service Centre of Multifaceted development for people in rural areas Physically Challenged. Rs. 2.10 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 2.10 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.59.
Nehru Foundation for DevelopmentThaltej TekraAhmedabad-380054.
Sustainable Natural Resource Management for Enhancing Livelihood Resilience of Rural Poor and Tribal and Tribal Communities in Drought Prone and Tribal Areas of Gujarat. Rs. 29.77 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 29.77 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.60.
Divya Prem Sewa Mission Trust,Sewa Kinj, Chandighat,Kankhal, HaridwarUttarakhand-249408.
(A) Inter College for Students belong to Economically weaker section(B) Hostel for students. Rs. 4020.00 lakh.
The Committee recommended approval for the project at the estimated cost of Rs.4020.00 lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.61.
Modicare Foundation, 4,Community Centre,New Friends Colony,New Delhi-110065.
Empowerment of marginalized and deprived children, youth, women and other communities. Rs. 10.00 Crore.
The Committee recommended approval for the project at the estimated cost of Rs . 10 .00 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.62.
Atul Rural Development FundC/o Atul LimitedAtul-396020TA & Distt. ValsadGujarat.
(a) Atul Institute of Vocational Excellence (AIVE)(b) Atul Rural Development Fund.Rs. 9.34 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 9.34 Crore for three financial years commencing with financial year,2015-16 i.e., 2015-16, 2016-17 and 2017-18.63.
Apollo Tyres Foundation,7, Institutional Area Sector-32,Gurgaon-122001.
(1) Drinking Water (2) School Building (3) Uplift of the rural poor or the urban slum dwellers (4) Pollution Control (5) Vocational Educational and Training (6) Conservation of natural resources or aforestation Rs.19.49 crore.
The Committee recommended approval for the project at the estimated cost of Rs.19.49 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.64.
Nankpura Ashram Welfare Trust SocietySadhubela Apartment, Bhopatwala,Haridwar, Uttarakhand.
(A) Educational Institution (i) Guru Nanak Girls Inter College; (ii) Guru Nanak Girls Degree College(B) Bridge and Road (i) Bridge over river – Sukhdev Setu (ii) Nanakpura Road. Rs. 46.02 Crore.
The Committee recommended approval for the project at the estimated cost of Rs. 46.02 Crore for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.65.
Mecheda Bhagaban Shree KrishnaMath Mission And Yogashram Kendra,Mechda No.1, Mini Market,Stall No. 118, Mecheda - P.O.,Kolaght – P.S. DistrictPurba MedinipurWest Bengal-721137.
Mobile Medical Dispensary – Pilot Project of Medical Centre. Rs.23.80 Lakh.
The Committee recommended approval for the project at the estimated cost of Rs.17.85 lakh for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.66.
Pranab Kanya SanghaP.O.Haridaypur Nth 24th ParganasKolkatta-700127.
Pranabananda Databya Chiktisalaya and Chakshu Seva Kendra.Rs.97.00 Lakh with Rs.50.00 lakh as corpus fund.
The Committee recommended approval for the project at the estimated cost of Rs. 97.00 lakh with Rs.50.00 lakh as corpus fund for three financial years commencing with financial year, 2015-16 i.e., 2015-16, 2016-17 and 2017-18.II. This notification shall remain in force for a period of three years in relation to financial years 2015-16, 2016-17 and 2017-18 in respect of the projects or schemes mentioned at serial numbers 1 to 66 of the Table above.
III. The exemption u/s 35AC will not apply to the funds received under Schedule VII of the Section 135 of the Companies Act and Companies (CSR) Rules 2014.
■■
← Notification No. 14/2016 [F.No. 142/15/2015-TPL] / SO 1101(E) · Notification No. 13 /2016 [F. No.142/33/2015-TPL] / SO 650(E) →
Source: the Income Tax Department’s own published text — its page for this instrument.